These eight catalogue solutions cover the practical automation layer around a 500kg AMR project: high-speed pick-and-place, packaging, lid application, SCARA assembly, and vision-guided handling. Product links are preserved exactly as supplied.

A compact SCARA route for small-part pick-and-place and line-side loading.
View product details
High-speed delta handling for wet-wipe lid application and packaging lines.
View product details
A cost-aware SCARA configuration for repeatable placement and machine tending.
View product details
For Da Nang electronics and 3C cells that need accurate planar motion.
View product details
IP54 protection and 6kg payload for sorting, picking, and gripper tasks.
View product details
A fast 3kg delta solution for light products and conveyor picking.
View product details
Six-kilogram delta platform with repeatability suited to demanding pick cycles.
View product details
Compact SCARA with 2D/3D vision for mixed-model handling and inspection.
View product detailsStandard JORI robot models can be ordered from 1 set. Final payload, speed, safety, and integration specifications are confirmed against the actual Da Nang site layout and load test.
For large facility logistics in Da Nang, a 500kg AMR autonomous carrier is not simply a cart with a motor. It is a mobile transport node whose return depends on route design, handoff discipline, charging ratio, fleet software, and local service readiness.
Information gain for buyers: ask for payload at the required lift height, with the required top module, at the required battery state, on the actual floor finish. A headline payload number without those conditions is not a purchasing specification.
Use this checklist before comparing quotations. It helps Da Nang wholesaler & wholesalers and end users separate a configured logistics solution from a generic catalogue robot.
Confirm load, top module, lifting height, center of gravity, and safety margin — not just the 500kg label.
Review map quality, dynamic obstacle handling, and re-localization in high-traffic aisles.
Check multi-robot dispatching, traffic rules, charging queues, and handoff scheduling.
Calculate moves per hour with loading, travel, wait, docking, and charging time included.
Validate API, PLC handshakes, call buttons, and exception handling with your actual software team.
Require site-specific risk review, scanner zones, warning zones, and operator training plans.
Check ramps, thresholds, door widths, floor flatness, Wi-Fi coverage, humidity, and coast air exposure.
Clarify Incoterms, Tien Sa Port or airport routing, import duty, VAT, and unloading responsibility.
Review factory credentials, patents, ISO 9001, onsite verification, and spare-parts commitments.
Start with one route or one shift, measure cycle time and labor saved, then scale the fleet.
Da Nang is central Vietnam's port, manufacturing, and distribution gateway. For automation planning, the relevant geography is the ring of industrial parks, port corridors, and nearby Quang Nam supply chains rather than the city center alone.
Facilities connected to Tien Sa Port and Da Nang International Airport need fast cross-docking, staged pallet movement, and repeatable handoffs between inbound and outbound zones. A 500kg AMR can reduce empty walking and manual cart travel in those fixed lanes.
Hoa Khanh, Lien Chieu, Hoa Cam, and Da Nang Hi-Tech Park projects often combine imported machines, local operators, and changing production layouts. Laser SLAM AMRs avoid fixed floor tape, which is valuable when aisles are reorganized.
Recruiting and retaining cart and forklift operators across shifts is a growing constraint for central Vietnam manufacturers. The strongest ROI usually comes from taking over repetitive, predictable routes before attempting complex mixed traffic.
Use the AMR for transport and the fixed robot for high-speed work at the workstation. The best projects combine both: mobile delivery to a cell, then delta or SCARA handling at the point of value creation.

Move totes, fixtures, or cart-based kits from storage to assembly or packaging lines with scheduled replenishment calls.

Connect inbound staging, QC, and outbound buffers with repeatable routes and fleet-managed traffic control.

Delta robots handle fast lid placement, sorting, and carton packing after the AMR delivers packaging materials to the line.

SCARA and vision systems provide compact, accurate placement and inspection at electronics workstations.

Combine mobile material delivery with delta-based pick-and-place for high-volume consumer product lines.

For clean or delicate handling, validate cleanroom, ESD, and contamination requirements with the robot configuration.
Match the hardware to the movement problem. A mobile robot is strongest when routes are repeated, handoffs are standardized, and wireless coverage is reliable.
| Option | Core Strength | Watch-Out Before Ordering | Best Da Nang Fit |
|---|---|---|---|
| AMR500kg AMR autonomous carrier | 500kg payload class, laser SLAM navigation, smart fleet management, large-facility routes. | Validate top module, lift height, safety scanners, charging ratio, Wi-Fi coverage, and handoff design. | Port-linked warehouses, 3PL operations, large factory internal logistics, cross-docking. |
| AMR400kg modular AMR mobile base | Lower payload with flexible top-module engineering for mixed production support. | Confirm payload ceiling after the top module, cleanroom/ESD needs, and battery strategy. | Electronics, pharmaceutical, high-mix assembly, and compact central Vietnam plants. |
| ForkliftAutonomous forklift | Pallet handling that aligns with existing racks, pallet flows, and warehouse layouts. | Aisle width, pallet quality, traffic rules, and site safety validation are critical. | Pallet shuttles, finished-goods warehouses, and facilities with existing pallet infrastructure. |
| FixedDelta / SCARA robot cell | High-speed picking, assembly, lid application, labeling, and inspection at a fixed station. | Requires guarding, end-effector design, vision, and line integration; not a transport solution. | Packaging lines, wet-wipe lid application, electronics assembly, cartoning, and sorting. |
JORI Intelligent Technology Co., Ltd. was founded in 2012 in Jinan, Shandong, China, a national robotics hub. The company specializes in industrial robot R&D and production, controller and 2D/3D vision development, OEM support, and automated system integration. For buyers, that means hardware, controller logic, vision, and engineering support can be sourced from one accountable manufacturer rather than a reseller chain.
JORI's published product lines include delta parallel robots, SCARA robots, AGV/AMR mobile robots, autonomous forklifts, and silicon wafer handling robots. For a Da Nang 500kg AMR project, the value is not only the mobile platform; it is the ability to integrate line-side delta and SCARA cells, controllers, vision, and project engineering into one automation roadmap.
Commercial flexibility also matters for wholesaler & wholesalers. JORI's published terms include FOB, CFR, CIF, EXW, CIP, FCA, CPT, and express delivery, with payment support for T/T, L/C, credit card, PayPal, Western Union, MoneyGram, and escrow in multiple currencies. Final terms should always be confirmed in the quotation.




Wholesaler & wholesalers should track three commercial signals, not only robot specifications: labor availability, building efficiency, and digital integration.
As central Vietnam manufacturing expands, facilities must do more with the same footprint. AMRs reduce non-value-added walking and cart handling without requiring fixed conveyor changes.
Buyers increasingly ask for risk assessments, energy strategy, battery planning, and documentation that supports audits, customer factory visits, and insurance reviews.
AMR value increases when the fleet receives calls from WMS/MES/ERP and reports exceptions. Da Nang projects should test integration logic before scaling from one route to ten.
Wholesaler & wholesalers sourcing for Da Nang should think beyond the first purchase order. The winning supplier relationship is standardized, documented, and service-ready.
Agree on a common controller family, spare scanner, charger, drive module, manual, and training package. Standard kits shorten commissioning and reduce local spare-parts inventory.
Document who receives alarms, how remote diagnostics work, how spare parts are shipped, and what response time applies to critical vs non-critical issues.
Quote ROI as moves per shift, labor hours avoided, and handoff reliability. One-off price comparisons often miss installation, training, spare parts, and downtime risk.
Da Nang localization tip: coastal humidity and salt-laden air can affect connectors, sensors, and maintenance intervals in facilities near the coast. Include the actual environment in the RFQ so the supplier can propose the right protection and service plan.
It refers to a mobile robot platform designed for a 500kg payload class, using autonomous navigation such as laser SLAM rather than fixed floor tracks. In large facility logistics, it moves carts, pallets, fixtures, or top modules between defined handoff points. The actual permitted load depends on the top module, lift height, center of gravity, safety configuration, and battery condition, so a site-specific confirmation is required.
JORI's standard delta robots, SCARA robots, and AMR/AGV platforms can be ordered from 1 set according to published information. This allows Da Nang buyers to validate a single lane, pilot cell, or packaging line before scaling to a larger fleet.
Yes, international shipment can be arranged through Da Nang's port and airport corridors. Confirm Incoterms, packaging, lifting points, unloading responsibility, import duty, VAT, and customs documentation with your freight forwarder before ordering. JORI's published delivery terms include FOB, CFR, CIF, EXW, CIP, FCA, CPT, and express delivery, with final terms from the official quotation.
Published accepted payment methods include T/T, L/C, credit card, PayPal, Western Union, MoneyGram, and escrow. Published currencies include USD, EUR, GBP, JPY, CAD, AUD, HKD, CHF, and CNY. For project-scale AMR and robot-cell orders, L/C or staged T/T structures are often reviewed with the final commercial quotation.
Integration is project-specific. The robotic fleet must exchange tasks, status, exceptions, and handoff signals with your software through APIs, PLC interfaces, or middleware. Bring your IT and automation partners into the technical review early. JORI develops its own controllers and 2D/3D vision, which can simplify the engineering conversation, but the final integration scope must be confirmed against the site's software stack.
Choose the 500kg AMR for large-facility transport with cart or pallet-adjacent top modules. Choose the 400kg modular AMR when the load is lower but the top module must be customized for electronics, pharma, or compact production support. Choose an autonomous forklift when existing pallet racks and pallet quality are central to the flow. Mark the routes, handoff points, and load weights on a layout drawing before requesting the final recommendation.
Laser SLAM reduces the need for fixed floor tape or magnetic markers and supports layout changes better than rigid guidance. However, site conditions still matter: clean maps, stable Wi-Fi, controlled doorways, reliable charging locations, and disciplined traffic rules are essential. High-traffic zones may need additional reflectors or commissioning adjustments after the site survey.
Require a site-specific risk assessment that covers vehicle speed, warning zones, scanner coverage, blind corners, pedestrian routes, charging areas, and emergency stop procedures. Train operators and nearby staff before the pilot. The final safety validation should reflect Vietnamese site rules and the end user's internal EHS requirements; do not rely on a generic brochure claim.
Yes. A one-route pilot is usually the best way to prove handoff time, dispatch logic, battery strategy, and operator acceptance. Choose a platform with fleet-management readiness, even if the first phase uses one robot. This protects the investment when the Da Nang site adds a second route or a second shift.
Send the facility layout with dimensions, load type and weight, top-module requirement, route length, number of handoffs, required moves per hour, shift pattern, floor conditions, doorway and aisle widths, power availability, Wi-Fi coverage, and WMS/MES/ERP details. Include photos or videos of the current cart or forklift flow. JORI's published average response time is 2 hours or less with a 97.06% response rate.
Send your layout, load, route, throughput target, shift pattern, power, and WMS/ERP requirements. The right solution may be a 500kg AMR, a 400kg modular platform, an autonomous forklift, or a combination with delta and SCARA line-side automation.